-
Inside the keep-out zone around the 115 kV power line conductor
-
Eight months of weathering on MDF covered with indoor urethane sealant
-
There were a lot of flakes
-
The hose heater could soak up 2.4 A of that
-
The default settings …produce a lot of fingers
-
Enough space to arrange them as needed






