By my count, four NYSDOT repair crews, one sent specifically to repair this sinkhole, managed to not patch it during the last nine months:

Good news comes to those who wait:

It didn’t involve waiting: by random chance, a fifth NYSDOT road repair crew happened to be in that area when Mary rode by. She stopped directly atop the sinkhole and screamed at the flagger until he came over. She explained the problem and, wonder of wonders, this time they put asphalt in the right spot.
The patch looks hand-tamped and will pop out after a while, but it’ll be great while it lasts.